
GBVIMS+ Development
Category | Grade:Professional | NO-BDeadline:29 Jul 2026Job ID:35623Posted on:21 Jul 2026
Overview
Designs and operationalises the electronic GBVIMS+ platform, configuring intake, classification, indicators and reporting while embedding anonymisation and survivor-centred safeguards, establishing inter-agency pathways, and delivering rollout training and technical handover.
Languages
Required: English, Shona or Ndebele
Job Areas
- Software Engineering & Development
- Gender Equality & Sexual Violence
Minimum Experience
7 years
Estimated Salary
Not available
Responsibilities
- Map standard intake tools and configure the electronic GBVIMS+ interface
- Integrate classification tools, minimum datasets and approved indicator banks
- Build the reporting backend and operational dashboard for programme indicators
- Implement anonymisation, information-security and survivor-safety guardrails
- Configure horizontal inter-agency referral and information-sharing pathways
- Prepare system architecture, rollout and pilot implementation plans
- Train users and support operational deployment of the customised platform
- Deliver system documentation, training guides and final technical handover
Requirements
- Advanced degree in information science, computer science or statistics
- At least seven years of experience developing data systems
- Strong Linux and DevOps capability with Ansible proficiency
- Expertise in gender-based-violence data management
- Demonstrated mastery of survivor-centred approaches and the Do No Harm principle in digital contexts
- Experience navigating Zimbabwean data-policy frameworks and multi-sector institutional environments
- Excellent communication skills in English
- Excellent communication skills in Shona or Ndebele
Skills
Database DevelopmentData System DesignSystem ConfigurationGBV Information ManagementData SecurityAnonymisationIndicator ProgrammingDevOpsCapacity BuildingTechnical Documentation
Tools
GBVIMS+LinuxAnsible
Additional info
- Deliverables include an inception report, configured interface, indicator dashboard, launch documentation and training guides
- Final handover and pilot framework are due by 15 October 2026